Chillicothe Elementary School

CHILLICOTHE ELEMENTARY SCHOOL

CHILLICOTHE, MISSOURI

  • Chillicothe R-II School District
  • New Construction
  • 60,000 SF
  • $13.9 Million

The community’s youngest learners thrive in their updated, interactive space.

Infants through first graders are excited to be in one, new building that encourages students to connect with the natural environment around them. Interior design and environmental graphics make this space come alive and encourage these little learners to imagine. It also helps these little learners to understand what a space’s purpose is without traditional wayfinding signage that they wouldn’t be able to read. The various learning environments include large instruction, small group and one-on-one.

The rural community of Chillicothe, Missouri, is committed to making big changes for their students. This new elementary school is just the first step in the District’s plan to get all their elementary school students in one new building and all their students on one campus around their high school.

Rising Hill and Northview Elementary Schools

RISING HILL AND NORTHVIEW ELEMENTARY SCHOOLS
RISING HILL AND NORTHVIEW ELEMENTARY SCHOOLS

Rising Hill and Northview Elementary Schools

KANSAS CITY, MISSOURI

  • North Kansas City School District
  • New Construction
  • Rising Hill: $20 million & 58,000 SF
  • Northview: $21.7 million & 70,900 SF
  • LEED Certified

Designed in tandem, Rising Hill and Northview Elementary Schools provide flexible, collaborative spaces that serve every type of learner.

Reinforcing a district-wide emphasis on literacy, the heart of these two schools are spacious, exposed media centers that push the envelope of a traditional library. Students have opportunities to gather on a learning stair for lessons, collaborate in smaller groups, or focus in a nook on an independent project or to enjoy their favorite book.

The academic neighborhoods set the stage for differentiated learning, accommodating every type of lesson and learner. Classrooms with garage doors are adjacent to collaborative spaces, amplifying space for group activities, breakout sessions or individualized learning. Writeable locker surfaces give students a sense of pride and ownership of their space, reinforcing an environment that is truly designed for the students.

As a forward-thinking district, the two elementary schools contain individual, single occupancy bathroom stalls that promote safety and privacy to ensure that every student feels comfortable in their environment.

Brookwood Elementary School

BROOKWOOD ELEMENTARY SCHOOL

LEAWOOD, KANSAS

  • Shawnee Mission School District
  • New Construction
  • 76,800 SF
  • $17.3 Million

The walls and floors come to life as avenues for learning and exploration.

Home to over 550 students, the Brookwood Beaver pride shines through in the building’s design. The original mascot, Oscar, is incorporated throughout the building, a nod to proud alumni of the previous Brookwood Elementary School. A mixture of colors and texture mimic those found in nature, and you’ll find a beaver den nestled under the learning stairs that provides a special place for students to socialize or study.

The built environment at Brookwood encourages learning through exploration. As students make their way through the corridors, subtle wayfinding cues and interactive environmental graphics inspire student engagement and spark inquiry. Beyond the interior walls are learning tools integrated onto the building’s façade – a central sun dial and diagram of the lunar phases.

Cassell Park Elementary School

CASSELL PARK ELEMENTARY SCHOOL

INDEPENDENCE, MISSOURI

  • Independence School District
  • New Construction
  • 69,000 SF
  • $20 Million

Complete project integration, from architectural design to brand development. 

The Independence School District needed a new elementary school to prevent overcrowding and eliminate all mobile trailers used in the district. Named after a community landmark and prestigious community figure, students and staff now have a permanent place to call home at Cassell Park Elementary.

Now Home of the Knights, students and teachers take pride in their newly branded identity, which is displayed throughout the school through prominent graphics. Just like a knight, the school represents a safe, protective space while exploring a more collaborative, flexible approach to learning.

Cassell Park is the first elementary in the district to pilot Project Lead the Way into its curriculum. A makerspace is seamlessly integrated into the media center with a retractable door, making hands-on learning visible for all to see.

Hopewell Elementary School

HOPEWELL ELEMENTARY SCHOOL

KANSAS CITY, MISSOURI

  • Park Hill School District
  • New Construction
  • 73,000 SF
  • $18.1 million

Indoor and outdoor exploration are encouraged through colorful environmental graphics, reinforced by nature.

Positioned atop a hill and nestled within trees, Park Hill School District’s new Hopewell Elementary is a sanctuary for discovery. 600 students, grades K-5, have the opportunity to use every square foot inside and out of the building for learning. Traditional hallways have been molded with flexible collaboration spaces to maximize flexibility and efficiency. Every core classroom has their own glass garage door, allowing teachers the opportunity to open into collaboration and project spaces. The art room looks out upon a patio facing the tree line, inspiring creativity in students and spilling natural light into the learning environment. The durable materials used on the exterior of the building will withstand the elements and provide a timeless look for generations of students to come in the future.

EPiC Elementary School

education design

EPiC ELEMENTARY SCHOOL

LIBERTY, MISSOURI

  • Liberty Public Schools
  • Adaptive Reuse
  • 30,000 SF
  • $1.8 Million

Re-imagining a former administrative building created innovative environments for all elementary school students while saving District resources and accommodating rapid population growth. Students at EPiC are encouraged to push the boundaries of what an educational space can be.

The team set out to do more with less, designing spaces that were flexible and multi-functional and support learning at all times. The District owned space in a nearby office building. By moving their administrative office into this space, it opened up space for a learning environment without the expense of designing a new building.

The former District Administrative Center was re-imagined into EPiC Elementary School, an innovative project-based learning environment where “Every Person is Inspired to Create.” Designed to support 300 students, EPiC looks at space differently than a traditional school. Every square foot of the building is viewed as a learning space, supporting student group work.  Hollis + Miller designed flexible, multipurpose classrooms where students are exposed to project-based learning and educational technology. The learning environment also fosters individual learning and encourages discovery. This is an environment where children choose their adventure and have the opportunity to learn however they learn best.

I really felt comfortable explaining my ideas to Hollis + Miller, and the best part was that they would take our ideas and expand upon them.

–Dr. Michelle Schmitz

Soaring Heights Elementary School

Soaring Heights Elementary School

JOPLIN, MISSOURI

  • Joplin School District
  • New Construction
  • 66,500 SF total
  • $13.5 million

One-of-a-kind collaborative spaces encourage impromptu idea sharing and intimate one-on-one learning.

The Learning Park, Tree House and Theatre in the Park are all flexible learning spaces unique to Soaring Heights. The flexible design emboldens educators and students to adapt their learning environment to the lesson.

This school replaces the elementary school lost on May 22, 2011, when the worst tornado disaster on record to date in the United States hit the City of Joplin.

Trailwood Elementary School

Trailwood Elementary School

OVERLAND PARK, KANSAS

  • Shawnee Mission School District
  • New Construction
  • 68,000 SF total
  • $16.9 million

Every space is an opportunity for learning. Described as a “dream school,” Trailwood focuses on hands-on, experiential learning.

Corridors that would traditionally be meant for travel are transformed into work areas with soft seating, tables and easily accessible technology. Accommodating 550 students grades pre-kindergarten through fifth grade, the Principal and community are excited about the possibilities this unique design provides.

Safety was a paramount concern throughout the design and construction because this new elementary school was built next to the existing facility, which stayed open and operational throughout construction. Careful coordination between the District, our team and JE Dunn’s construction team was paramount to ensure students and faculty at the existing school stayed safe and secure.

Briarwood Elementary School

Briarwood Elementary School

PRAIRIE VILLAGE, KANSAS

  • Shawnee Mission School District
  • New Construction
  • 72,000 SF
  • $16.7 million

The walls come alive to inspire young learners at this new school. Whimsical landscapes and playful typography encourage students to open their minds to new possibilities.

Focusing on brain-based learning, every space at this new elementary school accommodates experiential learning. Corridors are learning spaces, with seating for large and small-group collaboration and integrated technology.

Safety was a paramount concern throughout the design and construction because this new elementary school was built next to the existing facility, which stayed open and operational throughout construction. Careful coordination between the District, our team and JE Dunn’s construction team was paramount to ensure students and faculty at the existing school stayed safe and secure.