BVCTE-Kitchen3
Blue Valley High School CTE
The newly renovated CTE spaces at Blue Valley High School offer industry-standard facilities and equipment for hands-on, experiential learning experiences for students.

The renovations at Blue Valley High School have transformed the Family and Consumer Sciences (FACS) and Fashion, Apparel and Interior Design (FAID) spaces into modern learning environments that blend professional-grade experiences with practical skill development. These spaces are designed to serve two purposes: preparing students interested in culinary or design careers with industry-standard facilities while equipping all students with essential life and home skills.

Culinary Space Design

The reimagined culinary program features a 951-square-foot lecture space connected to a 970-square-foot kitchen/lab through a demo station equipped with cameras and television displays for clear student observation. The lab contains six fully equipped workstations—each with prep sinks and tables, cooktops, hand sinks, shelving, warmers and pan racks—that encourage teamwork while mirroring real-world culinary environments. An expansive storage room houses two commercial refrigerators, a freezer, ice machine, scullery sink, prep table, washer and dryer, and extensive shelving to support professional food safety protocols.

FAID Classroom Experience

The FAID classroom, relocated from a smaller space within what is now the kitchen/lab area, occupies what was previously a forum space. The new space room features individual workstations with sewing machines, four lab tables for collaborative projects, ample storage and a dedicated teacher’s workstation. 

These renovations at Blue Valley High School were completed alongside similar FACS transformations at Blue Valley North High School and Blue Valley West High School, all made possible through community support of the 2023 Blue Valley Bond Initiative. Looking ahead, FACS Foods classroom renovations are scheduled for completion during summer 2026 at Blue Valley Northwest, Blue Valley Academy and Blue Valley Southwest.

Overland Park, Kansas
Blue Valley School District
Renovation
21,000 SF
$12 million
>
>
Blue Valley High School CTE

Share Our Work:

Related Work

Blue Valley High School CTE

Park Hill High School

Park Hill South High School

Kansas City

1828 Walnut Street
Suite 922
Kansas City, MO 64108

816-442-7700

Colorado

115 Wilcox Street
Suite 210
Castle Rock, CO 80104

720-949-1689